Time - cost optimization problem considering environmental responsibilities in road construction projects
Guardat en:
| Idioma: | vie |
|---|---|
| Accés en línia: | https://dlib.udn.vn/module/chi-tiet-sach?RecordID=8407 |
| Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
| Thư viện lưu trữ: | Trung tâm Công nghệ thông tin và Học liệu số, Đại học Đà Nẵng |
|---|
Ítems similars
-
Applying the Hybrid Model to Optimize the Construction Cost index
per: Le, Thi Thuy Linh
Publicat: (2021) - Evaluation of the reliability of distribution power systems considering composite customer interruption cost /
-
The road safety project =
Publicat: (2004) -
Construction cost estimating
Publicat: (2005) -
OPTIMAL ALLOCATION AND SIZING OF CAPACITORS IN DISTRIBUTION SYSTEM CONSIDERING STOCHASTIC LOADS
per: Vũ, Văn Thắng, et al.
Publicat: (2023)