Time - cost optimization problem considering environmental responsibilities in road construction projects
Wedi'i Gadw mewn:
| Iaith: | vie |
|---|---|
| Mynediad Ar-lein: | https://dlib.udn.vn/module/chi-tiet-sach?RecordID=8407 |
| Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
| Thư viện lưu trữ: | Trung tâm Công nghệ thông tin và Học liệu số, Đại học Đà Nẵng |
|---|
Eitemau Tebyg
-
Applying the Hybrid Model to Optimize the Construction Cost index
gan: Le, Thi Thuy Linh
Cyhoeddwyd: (2021) - Evaluation of the reliability of distribution power systems considering composite customer interruption cost /
-
The road safety project =
Cyhoeddwyd: (2004) -
Construction cost estimating
Cyhoeddwyd: (2005) -
OPTIMAL ALLOCATION AND SIZING OF CAPACITORS IN DISTRIBUTION SYSTEM CONSIDERING STOCHASTIC LOADS
gan: Vũ, Văn Thắng, et al.
Cyhoeddwyd: (2023)