Time - cost optimization problem considering environmental responsibilities in road construction projects
Gorde:
| Hizkuntza: | vie |
|---|---|
| Sarrera elektronikoa: | https://dlib.udn.vn/module/chi-tiet-sach?RecordID=8407 |
| Etiketak: |
Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
|
| Thư viện lưu trữ: | Trung tâm Công nghệ thông tin và Học liệu số, Đại học Đà Nẵng |
|---|
Antzeko izenburuak
-
Applying the Hybrid Model to Optimize the Construction Cost index
nork: Le, Thi Thuy Linh
Argitaratua: (2021) - Evaluation of the reliability of distribution power systems considering composite customer interruption cost /
-
The road safety project =
Argitaratua: (2004) -
Construction cost estimating
Argitaratua: (2005) -
OPTIMAL ALLOCATION AND SIZING OF CAPACITORS IN DISTRIBUTION SYSTEM CONSIDERING STOCHASTIC LOADS
nork: Vũ, Văn Thắng, et al.
Argitaratua: (2023)