Time - cost optimization problem considering environmental responsibilities in road construction projects
Enregistré dans:
| Langue: | vie |
|---|---|
| Accès en ligne: | https://dlib.udn.vn/module/chi-tiet-sach?RecordID=8407 |
| Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
| Thư viện lưu trữ: | Trung tâm Công nghệ thông tin và Học liệu số, Đại học Đà Nẵng |
|---|
Documents similaires
-
Applying the Hybrid Model to Optimize the Construction Cost index
par: Le, Thi Thuy Linh
Publié: (2021) - Evaluation of the reliability of distribution power systems considering composite customer interruption cost /
-
The road safety project =
Publié: (2004) -
Construction cost estimating
Publié: (2005) -
OPTIMAL ALLOCATION AND SIZING OF CAPACITORS IN DISTRIBUTION SYSTEM CONSIDERING STOCHASTIC LOADS
par: Vũ, Văn Thắng, et autres
Publié: (2023)