Elements of tidal-Electric engineering
The focus of this text is the feasibility study. Power engineers gain both the knowledge and the skills needed to accurately determine the feasibility of a proposed tidal power development plan, including: Major factors to consider in selecting a site for preliminary assessment; Tidal power schemes...
Saved in:
| Main Author: | |
|---|---|
| Format: | Book |
| Language: | Undetermined |
| Published: |
New York
Wiley-IEEE
2007
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Institutions: | Trung tâm Học liệu Trường Đại học Cần Thơ |
|---|
| LEADER | 01248nam a2200205Ia 4500 | ||
|---|---|---|---|
| 001 | CTU_162746 | ||
| 008 | 210402s9999 xx 000 0 und d | ||
| 020 | |c 155 | ||
| 082 | |a 621.312134 | ||
| 082 | |b C594 | ||
| 100 | |a Clark, Robert H. | ||
| 245 | 0 | |a Elements of tidal-Electric engineering | |
| 245 | 0 | |c Robert H. Clark | |
| 260 | |a New York | ||
| 260 | |b Wiley-IEEE | ||
| 260 | |c 2007 | ||
| 520 | |a The focus of this text is the feasibility study. Power engineers gain both the knowledge and the skills needed to accurately determine the feasibility of a proposed tidal power development plan, including: Major factors to consider in selecting a site for preliminary assessment; Tidal power schemes and mode; Hydraulic and mathematical models of estuaries to predict the estuary's response to physical changes and the effects caused by operation of the proposed plant; Civil works required for tidal power development and the associated tidal generating equipment; Procedures to optimize plant output; Economic evaluation and risk assessment; Environmental impact of proposed construction and operation. | ||
| 650 | |a Water-power,Tidal power,Tidal power-plants | ||
| 904 | |i Giang | ||
| 980 | |a Trung tâm Học liệu Trường Đại học Cần Thơ | ||