The Ho Chi Minh city environmental sanitation project : Nhieu Loc - Thi Nghe Basin = Dự án vệ sinh môi trường thành phố Hồ Chí Minh

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of...

Mô tả đầy đủ

Đã lưu trong:
Chi tiết về thư mục
Tác giả của công ty: The World Bank in Vietnam (WB)
Định dạng: Sách
Ngôn ngữ:Undetermined
Được phát hành: Hà Nội The World Bank in Vietnam (WB) 2003
Những chủ đề:
Các nhãn: Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
Thư viện lưu trữ: Trung tâm Học liệu Trường Đại học Cần Thơ
LEADER 02199nam a2200217Ia 4500
001 CTU_171748
008 210402s9999 xx 000 0 und d
082 |a 363.72 
082 |b W927 
110 |a The World Bank in Vietnam (WB) 
245 4 |a The Ho Chi Minh city environmental sanitation project : 
245 0 |b Nhieu Loc - Thi Nghe Basin = Dự án vệ sinh môi trường thành phố Hồ Chí Minh 
245 4 |c The World Bank in Vietnam (WB) 
260 |a Hà Nội 
260 |b The World Bank in Vietnam (WB) 
260 |c 2003 
520 |a The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wastewater interceptor, to divert dry weather wastewater flows to the screening/pumping facility. In addition, combined sewer overflow structures will divert wastewater flows into the interceptor during dry weather. However, to mitigate the accumulated, odorous waters from the canal during rising tides, a canal flushing mechanism will be installed, drawing canal waters to the sewage interceptor, through withdrawal chambers located in the canal embankment, operated through automatic modes controlled from the pumping station. This pumping station will have hydraulic capacities, and is located at the confluence of the canal, and the Saigon River, with a river outfall discharge. 2) Drainage works to replace, and extend combined sewers to reduce overflows of storm-water, and wastewater. Includes dredging works for sludge transportation and disposal; cleaning inspection of secondary sewers; and, construction of tertiary sewers. Equipment will be procured to support institutional strengthening, and maintenance functions 
650 |a Vệ sinh, đô thị,Sanitation, urban 
650 |z Việt Nam,Vietnam 
904 |i Tuyết Nga, Trọng Hiếu 
980 |a Trung tâm Học liệu Trường Đại học Cần Thơ