The transmission distribution, and disaster reconstruction project = Dự án truyền tải, phân phối và xây dựng lại mạng lưới điện sau thiên tai
The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution sy...
Đã lưu trong:
Tác giả của công ty: | |
---|---|
Định dạng: | Sách |
Ngôn ngữ: | Undetermined |
Được phát hành: |
Hà Nội
The World Bank in Vietnam (WB)
2003
|
Những chủ đề: | |
Các nhãn: |
Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
|
Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
---|
LEADER | 01934nam a2200217Ia 4500 | ||
---|---|---|---|
001 | CTU_171758 | ||
008 | 210402s9999 xx 000 0 und d | ||
082 | |a 333.7932 | ||
082 | |b W927 | ||
110 | |a The World Bank in Vietnam (WB) | ||
245 | 4 | |a The transmission distribution, and disaster reconstruction project = | |
245 | 0 | |b Dự án truyền tải, phân phối và xây dựng lại mạng lưới điện sau thiên tai | |
245 | 4 | |c The World Bank in Vietnam (WB) | |
260 | |a Hà Nội | ||
260 | |b The World Bank in Vietnam (WB) | ||
260 | |c 2003 | ||
520 | |a The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution systems to meet demand, reduce losses and improve relativity; c) support power sector reform and restructuring; and d) support institutional strengthening and commercialization. The disaster component was added after typhoon Linda with the objective to help normalize economic activity in the typhoon affected areas through the reconstruction of the electricity distribution network in such areas. The project contains two distinct components. The Transmission and Distribution Component will: construct transmission lines and substations; expand certain substations; rehabilitate distribution networks; and provide consulting services and demand side management. The Disaster Reconstruction Component consists of reconstruction of low and medium voltage lines, as well as distribution transformer substations damaged by typhoon Linda. | ||
650 | |a Power transmission,Truyền tải điện năng | ||
650 | |z Vietnam,Việt Nam | ||
904 | |i Hải Ý, Trọng Hiếu | ||
980 | |a Trung tâm Học liệu Trường Đại học Cần Thơ |