The transmission distribution, and disaster reconstruction project = Dự án truyền tải, phân phối và xây dựng lại mạng lưới điện sau thiên tai

The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution sy...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autor corporatiu: The World Bank in Vietnam (WB)
Format: Llibre
Idioma:Undetermined
Publicat: Hà Nội The World Bank in Vietnam (WB) 2003
Matèries:
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
Thư viện lưu trữ: Trung tâm Học liệu Trường Đại học Cần Thơ
LEADER 01934nam a2200217Ia 4500
001 CTU_171758
008 210402s9999 xx 000 0 und d
082 |a 333.7932 
082 |b W927 
110 |a The World Bank in Vietnam (WB) 
245 4 |a The transmission distribution, and disaster reconstruction project = 
245 0 |b Dự án truyền tải, phân phối và xây dựng lại mạng lưới điện sau thiên tai 
245 4 |c The World Bank in Vietnam (WB) 
260 |a Hà Nội 
260 |b The World Bank in Vietnam (WB) 
260 |c 2003 
520 |a The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution systems to meet demand, reduce losses and improve relativity; c) support power sector reform and restructuring; and d) support institutional strengthening and commercialization. The disaster component was added after typhoon Linda with the objective to help normalize economic activity in the typhoon affected areas through the reconstruction of the electricity distribution network in such areas. The project contains two distinct components. The Transmission and Distribution Component will: construct transmission lines and substations; expand certain substations; rehabilitate distribution networks; and provide consulting services and demand side management. The Disaster Reconstruction Component consists of reconstruction of low and medium voltage lines, as well as distribution transformer substations damaged by typhoon Linda. 
650 |a Power transmission,Truyền tải điện năng 