Upgrading 110 KV system for rural electrification sub-projects managed by power company No.2, pro. code 41020B: Resettlement action plan, Main report (Revised version)
Đã lưu trong:
Nhiều tác giả của công ty: | Electricity of Vietnam, Power company No.2 |
---|---|
Formáid: | Leabhar |
Teanga: | Undetermined |
Foilsithe: |
Washington D.C.
The Word Bank
2001
|
Ábhair: | |
Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
---|
Míreanna Comhchosúla
-
Upgrading 110KV system for rural electrification sub-projects managed by Dong Nai power company pro. code 41030B:
Foilsithe: (2001) -
Sub-project: Thot Not - Chau Doc - Tinh Bien 220 KV transmission line and Chau Doc 220 KV substation:
Foilsithe: (2003) -
220 KV South Sai Gon substation and associated 220-110 KV T/L connections project:
Foilsithe: (2002) -
Global Electrification
Multinational Enterprise and International
Finance in the History of Light and Power,
1878–2007
le: Hausman, William J, et al.
Foilsithe: (2013) -
Transmission and disaster reconstruction project:
Foilsithe: (2003)