Just-in-time Making it happen: unleashing the power of continuous improvement
Based on his extensive experience Sandras reveals a complete procedure for successfully managing all of the challenges and possible obstacles in an actual implementation. Organizing the implementation team, developing a working Kanban system, restructuring the shop floor, creating efficient connecti...
Enregistré dans:
| Auteur principal: | Sandras, Jr. William A. |
|---|---|
| Format: | Livre |
| Langue: | Undetermined |
| Publié: |
U.S.A.
Oliver Wight Limited Publications
1989
|
| Sujets: | |
| Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
| Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
|---|
Documents similaires
-
Just-in-time for today and tomorrow
par: Ohno, Taiichi
Publié: (1988) -
Just-in-time manufacturing :
par: Lubben, Richard T.
Publié: (1988) -
A study of the Toyota production system from an industrial engineering viewpoint
par: Shingo, Shigeo
Publié: (1989) -
Attaining manufacturing excellence :
par: Hall, Robert W.
Publié: (1987) -
Handbook of MRP II and JIT
par: Petroff, John N