Graphical method to calculate the optimum replacement period for water meters /
Na minha lista:
| Outros Autores: | Arregui, F. J., Cabrera, E. Jr., Cobacho, R., Espert, V. |
|---|---|
| Formato: | Atigo |
| Idioma: | English |
| Assuntos: | |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
| Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
|---|
Registros relacionados
-
Optimal meter placement for water distribution system state estimation /
por: Kang, Doosun. -
Demand estimation with automated meter reading in a distribution network/
por: Aksela, K. - Multiobjective approach for pipe replacement based on bayesian inference of break model parameters /
-
All about hip replacement
por: Trahair, Richard
Publicado em: (1998) -
Prioritizing pipe replacement : From multiobjective genetic algorithms to operational decision support /
por: Giustolisi, Orazio.