Time - cost optimization problem considering environmental responsibilities in road construction projects
Zapisane w:
| Język: | vie |
|---|---|
| Dostęp online: | https://dlib.udn.vn/module/chi-tiet-sach?RecordID=8407 |
| Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|
| Thư viện lưu trữ: | Trung tâm Công nghệ thông tin và Học liệu số, Đại học Đà Nẵng |
|---|
Podobne zapisy
-
Applying the Hybrid Model to Optimize the Construction Cost index
od: Le, Thi Thuy Linh
Wydane: (2021) - Evaluation of the reliability of distribution power systems considering composite customer interruption cost /
-
The road safety project =
Wydane: (2004) -
Construction cost estimating
Wydane: (2005) -
OPTIMAL ALLOCATION AND SIZING OF CAPACITORS IN DISTRIBUTION SYSTEM CONSIDERING STOCHASTIC LOADS
od: Vũ, Văn Thắng, i wsp.
Wydane: (2023)