Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion

Đã lưu trong:
Chi tiết về thư mục
Tác giả chính: MAI, LÂM TUẤN
Định dạng: Bài viết
Ngôn ngữ:Vietnamese
Được phát hành: 2024
Những chủ đề:
Truy cập trực tuyến:https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/250240
Các nhãn: Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
Thư viện lưu trữ: Thư viện Trường Đại học Đà Lạt
id oai:scholar.dlu.edu.vn:DLU123456789-250240
record_format dspace
spelling oai:scholar.dlu.edu.vn:DLU123456789-2502402024-12-29T09:35:05Z Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion MAI, LÂM TUẤN Tạp chí Khoa học Kỹ thuật Thủy lợi và Môi trường 2024-12-28T12:40:44Z 2024-12-28T12:40:44Z 2018 Article https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/250240 vi Tạp chí Khoa học Kỹ thuật Thủy lợi và Môi trường - 2018 - no.60 - tr. - ISSN. application/pdf
institution Thư viện Trường Đại học Đà Lạt
collection Thư viện số
language Vietnamese
topic Tạp chí Khoa học Kỹ thuật Thủy lợi và Môi trường
spellingShingle Tạp chí Khoa học Kỹ thuật Thủy lợi và Môi trường
MAI, LÂM TUẤN
Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
format Article
author MAI, LÂM TUẤN
author_facet MAI, LÂM TUẤN
author_sort MAI, LÂM TUẤN
title Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
title_short Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
title_full Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
title_fullStr Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
title_full_unstemmed Se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
title_sort se-lection of the maximum flow rate for the river flow diversion design for constructions when the main construction is involved in the flow diversion
publishDate 2024
url https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/250240
_version_ 1822629841709563904