Assessment of the impacts of planning traffic bridges system across red river on Ha noi reach to the river bank erosion and river bed changes for period from 2020 to 2030
Gespeichert in:
Hauptverfasser: | Nguyen, Thi Ngoc Nhan, Nguyen, Hong Quang, Nguyen, Ngoc Đang |
---|---|
Format: | Artikel |
Sprache: | Vietnamese |
Veröffentlicht: |
2025
|
Schlagworte: | |
Online Zugang: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/262675 |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
---|
Ähnliche Einträge
-
Master Plan for the Red river - Thai Binh river basin for the 2021-2030 period, with a vision to 2050
von: Trần, Thị Thanh Tâm
Veröffentlicht: (2025) -
Master plan for the Dong Nai river basin in the 2021 - 2030 period, with a vision to 2050
von: Trần, Thị Thanh Tâm
Veröffentlicht: (2025) -
Biogeochemical processes and microbial characteristics across groundwater-surface water boundaries of the Hanford reach of the Columbia river /
von: . -
SOIL EROSION IN DA RIVER BASIN AND SEDIMENTATION IN HOA BINH RESERVOIR
von: Nguyen, Kien Dung
Veröffentlicht: (2023) -
CLIMATE CHANGE TRENDS IN THE RED RIVER DELTA
von: Nguyen, Thi Phuong Hang, et al.
Veröffentlicht: (2025)