Assessment of the impacts of planning traffic bridges system across red river on Ha noi reach to the river bank erosion and river bed changes for period from 2020 to 2030
Uloženo v:
Hlavní autoři: | Nguyen, Thi Ngoc Nhan, Nguyen, Hong Quang, Nguyen, Ngoc Đang |
---|---|
Médium: | Článek |
Jazyk: | Vietnamese |
Vydáno: |
2025
|
Témata: | |
On-line přístup: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/262675 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
---|
Podobné jednotky
-
Master Plan for the Red river - Thai Binh river basin for the 2021-2030 period, with a vision to 2050
Autor: Trần, Thị Thanh Tâm
Vydáno: (2025) -
Master plan for the Dong Nai river basin in the 2021 - 2030 period, with a vision to 2050
Autor: Trần, Thị Thanh Tâm
Vydáno: (2025) -
Biogeochemical processes and microbial characteristics across groundwater-surface water boundaries of the Hanford reach of the Columbia river /
Autor: . -
SOIL EROSION IN DA RIVER BASIN AND SEDIMENTATION IN HOA BINH RESERVOIR
Autor: Nguyen, Kien Dung
Vydáno: (2023) -
CLIMATE CHANGE TRENDS IN THE RED RIVER DELTA
Autor: Nguyen, Thi Phuong Hang, a další
Vydáno: (2025)