Assessment of the impacts of planning traffic bridges system across red river on Ha noi reach to the river bank erosion and river bed changes for period from 2020 to 2030
Saved in:
Main Authors: | Nguyen, Thi Ngoc Nhan, Nguyen, Hong Quang, Nguyen, Ngoc Đang |
---|---|
Format: | Article |
Language: | Vietnamese |
Published: |
2025
|
Subjects: | |
Online Access: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/262675 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institutions: | Thư viện Trường Đại học Đà Lạt |
---|
Similar Items
-
Master Plan for the Red river - Thai Binh river basin for the 2021-2030 period, with a vision to 2050
by: Trần, Thị Thanh Tâm
Published: (2025) -
Master plan for the Dong Nai river basin in the 2021 - 2030 period, with a vision to 2050
by: Trần, Thị Thanh Tâm
Published: (2025) -
Biogeochemical processes and microbial characteristics across groundwater-surface water boundaries of the Hanford reach of the Columbia river /
by: . -
SOIL EROSION IN DA RIVER BASIN AND SEDIMENTATION IN HOA BINH RESERVOIR
by: Nguyen, Kien Dung
Published: (2023) -
CLIMATE CHANGE TRENDS IN THE RED RIVER DELTA
by: Nguyen, Thi Phuong Hang, et al.
Published: (2025)