Assessment of the impacts of planning traffic bridges system across red river on Ha noi reach to the river bank erosion and river bed changes for period from 2020 to 2030
Đã lưu trong:
Những tác giả chính: | Nguyen, Thi Ngoc Nhan, Nguyen, Hong Quang, Nguyen, Ngoc Đang |
---|---|
格式: | Bài viết |
语言: | Vietnamese |
出版: |
2025
|
主题: | |
在线阅读: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/262675 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
---|
相似书籍
-
Master Plan for the Red river - Thai Binh river basin for the 2021-2030 period, with a vision to 2050
由: Trần, Thị Thanh Tâm
出版: (2025) -
Master plan for the Dong Nai river basin in the 2021 - 2030 period, with a vision to 2050
由: Trần, Thị Thanh Tâm
出版: (2025) -
Biogeochemical processes and microbial characteristics across groundwater-surface water boundaries of the Hanford reach of the Columbia river /
由: . -
SOIL EROSION IN DA RIVER BASIN AND SEDIMENTATION IN HOA BINH RESERVOIR
由: Nguyen, Kien Dung
出版: (2023) -
CLIMATE CHANGE TRENDS IN THE RED RIVER DELTA
由: Nguyen, Thi Phuong Hang, et al.
出版: (2025)