Cost C16 Improving the Quality of Existing Urban Building Envelopes Facades and Roofs
The main goal of the Working Group 3B (WG3B) of the COST Action C16 was to study the different technical possibilities to retrofit the functional requirements of the multi-storey housing building envelopes of European buildings built after the II World War. This work is based on the State-of-the-...
Đã lưu trong:
Những tác giả chính: | , , , |
---|---|
Định dạng: | Sách |
Ngôn ngữ: | English |
Được phát hành: |
IOS Press
2013
|
Những chủ đề: | |
Truy cập trực tuyến: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/35132 |
Các nhãn: |
Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
|
Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
---|
Tóm tắt: | The main goal of the Working Group 3B (WG3B) of the COST Action C16 was to study the
different technical possibilities to retrofit the functional requirements of the multi-storey housing
building envelopes of European buildings built after the II World War. This work is based
on the State-of-the-Art documents and on the needs of such buildings that were identified by
Working Group 2. |
---|