The dau tieng irrigation project = Dự án tưới tiêu dầu tiếng
Major components of the proposed project are: (a) construction of an earth dam and its appurtenant works on the Saigon River in the southwestern part of Viet Nam; and (b) construction of a gravity irrigation system for about 42,000 ha of currently rainfed land, including an adequate drainage network...
Đã lưu trong:
| Údar Corparáideach: | |
|---|---|
| Formáid: | Leabhar |
| Teanga: | Undetermined |
| Foilsithe: |
Ha Noi
The World Bank in Vietnam (WB)
2003
|
| Ábhair: | |
| Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
| Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
|---|
| Achoimre: | Major components of the proposed project are: (a) construction of an earth dam and its appurtenant works on the Saigon River in the southwestern part of Viet Nam; and (b) construction of a gravity irrigation system for about 42,000 ha of currently rainfed land, including an adequate drainage network, inspection and access roads and two low-lift pumping stations to serve about 4,000 ha within the 42,000 ha service area. The project also makes provision for the engagement of experts for the dam review panel; training of construction engineers and heavy equipment operators and maintenance personnel; procurement of vehicles, equipment, and construction materials and supplies; and the preparation of a comprehensive program for agricultural supporting services. |
|---|