The dau tieng irrigation project = Dự án tưới tiêu dầu tiếng
Major components of the proposed project are: (a) construction of an earth dam and its appurtenant works on the Saigon River in the southwestern part of Viet Nam; and (b) construction of a gravity irrigation system for about 42,000 ha of currently rainfed land, including an adequate drainage network...
Đã lưu trong:
Tác giả của công ty: | |
---|---|
Định dạng: | Sách |
Ngôn ngữ: | Undetermined |
Được phát hành: |
Ha Noi
The World Bank in Vietnam (WB)
2003
|
Những chủ đề: | |
Các nhãn: |
Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
|
Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
---|
LEADER | 01441nam a2200205Ia 4500 | ||
---|---|---|---|
001 | CTU_171849 | ||
008 | 210402s9999 xx 000 0 und d | ||
082 | |a 333.913 | ||
082 | |b W927 | ||
110 | |a The World Bank in Vietnam (WB) | ||
245 | 4 | |a The dau tieng irrigation project = | |
245 | 0 | |b Dự án tưới tiêu dầu tiếng | |
245 | 4 | |c The World Bank in Vietnam (WB) | |
260 | |a Ha Noi | ||
260 | |b The World Bank in Vietnam (WB) | ||
260 | |c 2003 | ||
520 | |a Major components of the proposed project are: (a) construction of an earth dam and its appurtenant works on the Saigon River in the southwestern part of Viet Nam; and (b) construction of a gravity irrigation system for about 42,000 ha of currently rainfed land, including an adequate drainage network, inspection and access roads and two low-lift pumping stations to serve about 4,000 ha within the 42,000 ha service area. The project also makes provision for the engagement of experts for the dam review panel; training of construction engineers and heavy equipment operators and maintenance personnel; procurement of vehicles, equipment, and construction materials and supplies; and the preparation of a comprehensive program for agricultural supporting services. | ||
650 | |a Irrigation,Thủy lợi,Drainage,Thoát nước | ||
904 | |i Kiều Trang, Ngoc Anh, Trọng Hiếu | ||
980 | |a Trung tâm Học liệu Trường Đại học Cần Thơ |