Just-in-time Making it happen: unleashing the power of continuous improvement
Based on his extensive experience Sandras reveals a complete procedure for successfully managing all of the challenges and possible obstacles in an actual implementation. Organizing the implementation team, developing a working Kanban system, restructuring the shop floor, creating efficient connecti...
Bewaard in:
Hoofdauteur: | Sandras, Jr. William A. |
---|---|
Formaat: | Boek |
Taal: | Undetermined |
Gepubliceerd in: |
U.S.A.
Oliver Wight Limited Publications
1989
|
Onderwerpen: | |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Thư viện lưu trữ: | Trung tâm Học liệu Trường Đại học Cần Thơ |
---|
Gelijkaardige items
-
Just-in-time for today and tomorrow
door: Ohno, Taiichi
Gepubliceerd in: (1988) -
Just-in-time manufacturing :
door: Lubben, Richard T.
Gepubliceerd in: (1988) -
A study of the Toyota production system from an industrial engineering viewpoint
door: Shingo, Shigeo
Gepubliceerd in: (1989) -
Attaining manufacturing excellence :
door: Hall, Robert W.
Gepubliceerd in: (1987) -
Handbook of MRP II and JIT
door: Petroff, John N