Overview methods to evaluate the benefit in flood risk reduction investment projects
Đã lưu trong:
Những tác giả chính: | Nguyễn, Thiện Dũng, Nguyễn, Quang Kim, Nguyễn, Thu Hiền |
---|---|
Formáid: | Bài viết |
Teanga: | Vietnamese |
Foilsithe: |
2024
|
Ábhair: | |
Rochtain Ar Líne: | https://scholar.dlu.edu.vn/thuvienso/handle/DLU123456789/252105 |
Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Thư viện lưu trữ: | Thư viện Trường Đại học Đà Lạt |
---|
Míreanna Comhchosúla
-
Ranking the risk factors for investment in the small and medium hydropower projects in Vietnam
le: Đỗ, Văn Chính
Foilsithe: (2024) -
Ranking the risk factors for investment in the small and medium hyd-ropower projects in Vietnam
le: ĐỖ, VĂN CHÍNH
Foilsithe: (2024) -
Floods and farmers :
le: Phạm, Công Hữu
Foilsithe: (2011) -
An overview of labor productivity in construction
le: Nguyễn, Đức Lợi, et al.
Foilsithe: (2024) -
Study on impact of Kenh Ga Van Trinh project on flood control in Hoang Long and Day river basin
le: PHẠM, THỊ HƯƠNG LAN
Foilsithe: (2024)